Method of Construction Quality Control for Foshan Steel Structure Project

Hits:1575 Time:2017-2-22
  

Method of Construction Quality Control for Foshan Steel Structure Project

The technical quality of the document, the preparation and review of the report is an important means of comprehensive control of the quality of the project, the specific content is as follows:

1, the production project

(1) audit construction plans, design changes, modify the map.

(2) test and preparation of the application of new technology, new technology, new materials, new structure of the technical appraisal book.

(3) the preparation and review of technical process documents (such as production instructions, technical guidance, painting essentials, packaging and shipping instructions, process), quality inspection documents (such as quality inspection documents, quality checklist, etc. ).

(4) the relevant materials, semi-finished product quality checklist and so on.

(5) timely feedback to reflect the quality of the process of dynamic statistical data or management charts.

(6) timely handling of the quality of the project accident, make a report, put forward appropriate corrective and preventive measures.

(7) do a good job of product acceptance delivery information.

2, the installation of the project

(1) the preparation and audit of the construction program and construction organization design, to ensure the quality of the project has reliable technical measures.

(2) audit the official start report, issued a start instruction.

(3) audit into the construction site of the subcontractor of the technical qualification documents, personnel qualification certificate.

(4) review the relevant materials, finished products, semi-finished product quality inspection refers to, material certificate, test report.

(5) review the construction drawings, design changes, modify the drawings and notice, agreement, instructions.

(6) the preparation and testing of the application of new technology, new technologies, new materials, new structure of the technical appraisal book.

(7) to do the process of handover inspection, sub-division of the project quality inspection report.

(8) timely handling of the quality of the accident, do a good job reporting, put forward appropriate corrective and preventive measures.

(9) timely feedback process quality dynamic statistical data or management charts.

(10) timely to do the project acceptance information.