Foshan Shengbang Steel Structure Co., Ltd.

11 years experience in plant design and construction

Common choice of 1875 sets of steel structure buildings

National service hotline:

0757-81002668
4News

Safety management measures for steel structure engineering in Foshan

Hits:1860 Time:2017-3-31
  In the poor weather conditions led to frequent accidents in construction, in order to secure the construction of steel structure, the state of Foshan steel structure finishing safety management measures for reference:
胜邦钢结构
1, the establishment of a complete system of installation management system, layers of checks to implement.
2, regular physical examination of the operator, is prohibited from suffering from high blood pressure, heart disease, anemia, mental disorders engaged in aerial work.
3, the operation of personnel safety assessment, strengthen the safety of knowledge education, enhance their safety awareness, to participate in high altitude operation personnel must strictly abide by the safe operation rules of high-altitude operation.
4, the lifting of the work area is strictly prohibited in the construction of different projects at the same time, the roof beam lifting at both ends of the wind rope, control the swing of the beam, to prevent beam injury. In the process of lifting steel structure in special field monitoring inspections to prevent idlers in lifting area around. In addition, the steel pipe is used as a two layer movable frame to be used for fixing bolts in the roof beam, and the upper end of the movable frame must be tied with a big rope and a stigma to prevent overturning.
5, lifting operation personnel must obey the command of the field management personnel, do work and rest to ensure that the staff energetic.
6, to enter the construction site must wear a helmet, high-altitude workers must wear a seat belt, a violation of fines system, starting from the education to strengthen safety awareness, and promote the formation of standardized safety construction.
7, the lifting of the steel wire rope, the clasp should be regularly checked, found problems in a timely manner to solve the problem in strict accordance with the updated standard requirements.
8, master the weather conditions, in case of bad weather and more than six winds, thunderstorms, fog and so on, immediately stop lifting operation, after the rain is strictly prohibited in the outdoor welding work.
14, in the lifting stage, the team should often organize the lifting of the work of the safety meeting will be held to further improve the safety awareness of workers, to ensure the safety of hoisting.
15, each in charge of the team responsible for the whole class in different positions in the security and security work in the work of the follow-up inspection. On the basis of the construction of the various safety accounts, but also closely monitor the safety of the work of the monitor and supervision, to ensure that all the safety of the lifting process of steel structure.