Foshan Shengbang Steel Structure Co., Ltd.

11 years experience in plant design and construction

Common choice of 1875 sets of steel structure buildings

National service hotline:

0757-81002668
4预制钢结构仓库

Prefabricated Steel Sturcture Warehouse

Prefabricated Steel Sturcture Warehouse

Prefabricated Steel Sturcture Warehouse

 

1、STEEL STRUCTURE WAREHOUSE
Shengbang's steel structure warehouse features of high fire resistance, strong corrosion resistance. Industry steel structure warehouse usually made of steel beams, steel columns, steel trusses and other components of the composition; each component using welds, bolts or rivets to connect. The usage scale includes large-scale workshop, or used for the warehouse, supermarkets, entertainment centers and modular steel structure garage.

 

2、Steel Structure material introduction

H section steel
H type steel is an economic efficient section material with optimized cross section area allocation and more reasonable ratio of strength to weight. It is named because of its letter "H" cross section. Since its different parts are of orthogonal configuration, h-beam has advantage of good bending capacity, simple construction, cost saving and structure light weight etc., has been widely used.

 

H-beam is divided into: 
The flange wide type (HW) 
The flange middle type (HM) 
The narrow flange type (HN) 
Thin-wall h-beam type (HT) 
H section steel pile type (HU) 

 

C steel was processed after hot rolling and cold bending. Its characteristics are: thin wall, light weight, good cross section performance, high strength (compared with the traditional steel) and can save 30% materials compared with the equivalent steel.


C type steel is widely used in purlin and wall beam steel structure building, also can combined into lightweight roof, carrier construction, etc. In addition, it can also be used for machinery and column, beam and arm light industrial manufacturing.

 

3.Product Details

Usage Steel Structure workshop,warehouse,office or so on.
Size length*width*high, and the ridge height, slope
 Standard  China Standard,England Standard,America Standard or Australia Standard(please supply the detail date)
Crane Do you need the crane?If you need please tell me the loding.
Country Which country that the building will be?
Design load Wind speed, Snow load, Earthquake
Wall and Roof Steel sheet or sandwich panel
Insulation Fiber glass, EPS,Rock wool,PU,please tell me the thickness
Surface Painted (alkyd paint or Epoxy paint) ,Hot dip galvanize
Window Quantity, material, dimension (W*H) and position
Door Quantity, material, dimension (W*H) and position
Accessories Down pipe, Out gutter, Ventilator, skylight etc.


 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4.Transportation


Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:

 

1). Seaworthy
 In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size      to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.

 

 

 

 

2).Package for the steel frame
If you want to use the 40 HQ container to transportation the whole steel structure product. You can do the steel frame to package ,use the cable wire to fix. But you must paid for the steel frame and baling charges.

 

 

 

5.Guidance installation


  Shengbang Steel Structure Company can supply the guidance installation service.Usually steel structure building is a large installation engineering. If customers may need the professional technical engineer to supervise the installation on site overseas, the customer must to inform before 1 months from leave the China . But customer should coordinate with us for following aspects:
Customer should provide:
  1) Translator or assistant on site.
  2.)All costs raised including: 
       A. visa fee 
       B. Round trip flight ticket 
       C. Accident insurance for the supervisor during the period 
       D. Accommodation 
       E. Daily meals 
       F. Internet 
       G. Local traffic fee (if any)
 3) The customer should pay the engineer with supervision fee, which can be  negotiated and decided by both.
 4)Customer has the responsibility to provide necessary security system to protect the supervisor, especially in some unrest countries.
There have some guidance installation picture:

      

  

6、Service flow path:

 Discussing Project——Design Plan Drawing——Budget & Quote——Confirm Drawing&Quotation——Sign the Contract——Make the shop Drawing——Manufacturing——Transportation——Shipping——Foundation Ready——Guidance Installation——Finshed Installation

7、Application range-Industry
Industry steel structure included warehouse,workshop,garage,hangar,platform.
 Steel structure features of high fire resistance, strong corrosion resistance. Industry steel structure warehouse usually made of steel beams, steel columns, steel trusses and other components of the composition; each component using welds, bolts or rivets to connect. The usage scale includes large-scale workshop, or used for the warehouse, supermarkets, entertainment centers and modular steel structure garage.

FOSHAN SHENGBANG STEEL STRUCTURE CO., LTD

Add:Pingtang Industrial Park, Shipeng Village, Shishan Town, Nanhai District, 
Foshan, Guangdong Province, China
Tel:0086-757-63323396   0086-18900873268   Fax:0086-757-81196682