Foshan Shengbang Steel Structure Co., Ltd.

11 years experience in plant design and construction

Common choice of 1875 sets of steel structure buildings

National service hotline:

0757-81002668
4羽毛球馆
Your location: Home ->  Harvest Badminton Hall

Harvest Badminton Hall

Harvest Badminton Hall

 

1.Steel structure GYM

Sports and physical exercise building. Stadium by the use of nature can be divided two types of competition hall and museum practice; Press sport can be divided into basketball hall, ice hockey hall, athletics hall, etc.; according to body size can be divided into large, medium and small, generally divided by the number of seats the audience, China is now the auditorium over 8000 known large stadium, less than 3000's called small stadium, called in between medium-sized gymnasium.

 

2、Steel Structure Material

 

1)H section steel
H type steel is an economic efficient section material with optimized cross section area allocation and more reasonable ratio of strength to weight. It is named because of its letter "H" cross section. Since its different parts are of orthogonal configuration, h-beam has advantage of good bending capacity, simple construction, cost saving and structure light weight etc., has been widely used. 

 

2)H-beam is divided into: 
The flange wide type (HW) 
The flange middle type (HM) 
The narrow flange type (HN) 
Thin-wall h-beam type (HT) 
H section steel pile type (HU) 

 

3.Product details

 Product Name Prefabricated Steel Structure GYM
 Specification  Foundation  Concrete and Steel
 Support  X or V types, angle steel or round tube
 Surface  Two layers and anti-rust paint
 Color  White, Grey, Blue, Green, etc
 size  Designed by your requirement
Advantages

1. Stable Construction
2. Anti-seismic performance
3. Aesthetic appearance
4. Short construction period
5. High-speed installation
6. Life span durability
7. Environmental-Friendly product
8. Energy saving

 Main component  Base materials  Cement and steel foundation bolts
 Main frame  H beam (welded or hot rolled)
 Material  Q35B,Q345B
 Purlin  C purlin (C120-320) or Z Purlin (Z100-200)
 Bracing  Tie bar, lateral bracing, column bracing, knee bracing, etc
 Bolt Normal bolt, high strength bolts, Galvanized bolt 
 Roof & wall  Sandwich panel, steel corrugated sheet
 Door  Sliding door , rolling shutter
 Window  PVC window, aluminum-alloy Window
 Accessories  Skylight, ventilation, downpipe and galvanized gutter etc .

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4、Advantages:

1) Wide span: Single span or multiple spans, the max span clear distance is 36m, without middle column.
2) Low cost: Unit price range from USD35 to USD70/square meter FOB according to customer's request.
3) Fast construction and easy in installation.
4) Long service life: More than 50 years.
5) Environmental protection, stable structure, earthquake resistance, water proofing, and energy saving.

 

5.Provide data

If you really interested in Prefabricated Steel Structure building, and would like we do the design for you, please give me the following information:
1. Dimension: Length, width, height, eave height, roof pitch, etc.
2. Doors and windows: dimension, quantity, position to put them.
3. Local climate: wind speed, snow load, etc.
4. Insulation material: sandwich panel or steel sheet.

 

5.Transportation


Steel structure is mainly composed of steel column, steel beam, steel frame and the rigid support and so on, so steel structure component volume is larger, The mainly transportation for export is as follow:

 

1). Seaworthy
 In general, after customer order, our engineering technology department design the steel structures will be according to the 40 'HQ and 40' open top container inside size      to design the shipment, in most cases, we use 40 'HQ and 40' open top shipping container shipment to pack steel structures.

2).Package for the steel frame
If you want to use the 40 HQ container to transportation the whole steel structure product. You can do the steel frame to package ,use the cable wire to fix. But you must paid for the steel frame and baling charges.

 

7.FAQ

1)Is it difficult to install prefabricated steel house?
  No. Since it is a precisely prefabricated steel building, customer can install it by themselves with the provided bolts and screws, according to the standard installation drawing .


2)Is there any warranty available on the steel structure buildings?
 The steel structure buildings have limited warranty. Usually, we build the house complied with the GB Chinese standard, which is consult U.S. building codes.


3)What is the basic information of container house supplied by client?
We often get inquires for quotation from customers who even have no idea about the difference between flat pack container house with sandwich panel and modified container house. It always makes things complicated. Actually, we can provide you with quotation quickly but only when the client supply basic information as the following:
* Construction area, the quantity of containers house needed.
* Layout of the project.
* Usage of container house. (for labor house, container hotel, storage, container office or others)
* Local environment, weather and landform.
* With bathroom and toilet or not.
* Requirements for decoration or not.
* With electricity or not. Requirements for electricity are designed according to the plan.